MIG/MAG welding · Serbia
MIG/MAG welding of steel and metal structures
Semi-automatic welding of carbon steel in our workshop in Požarevac, Serbia: brackets, frames, bases and assemblies to your drawings. Joint preparation and parameters follow the material, thickness and quality requirements.
Processes 131 and 135
When MIG/MAG is the right choice
With MIG/MAG the wire is fed continuously, so deposition is higher than with TIG. That makes it suitable for longer seams, thicker sections and batches of steel items.
MAG (135) uses an active shielding gas — usually an argon/CO₂ mix — for carbon steel. MIG (131) uses an inert gas and is applied to non-ferrous metals. Gas, wire and parameters depend on the base material and the joint requirements.
For thin walls, stainless pipework and visible joints TIG is often the better option. Thicker joints can combine both: a TIG root with MAG fill and cap passes.
TIG welding (141) →
Typical work
Steel items and assemblies to drawing
We confirm feasibility after reviewing dimensions, material, joint access and quantities.
Brackets and supports
Supports for equipment, piping and services with defined dimensions, holes and connection plates.
Frames and bases
Welded frames from tubes, hollow and open sections, to drawing and bill of materials.
Walkways, railings, platforms
Auxiliary steel structures for plants and buildings, within the scope defined by the design.
Metal structures →Repeat items
Small batches of identical items to the client’s marks and an agreed delivery schedule.
Subcontracting →Client-prepared parts
Welding of cut and prepared parts, after checking the joint preparation.
Repairs and reinforcement
Assessed on the condition of the part, the material and the modification supplied.
Joint quality
What determines the result
MAG weld quality does not depend on the machine alone. Edge preparation, gap, surface cleanliness, fit-up and welding sequence are decisive.
- The welding sequence is planned to limit distortion of long members and frames.
- Dimensions are checked after fit-up and before final welding.
- All items are visually inspected; additional testing is agreed in advance.
- State the required quality level (e.g. EN ISO 5817) on the drawing or in the enquiry.
Load-bearing structures
For load-bearing steel structures, specific standards or documented conformity, conditions and responsibilities are agreed before an order is accepted.
IWT is the personal qualification of Stefan Bogovac. BogoHvac does not present itself as a company certified to EN 1090 or ISO 3834.
Professional qualification →FAQ
MIG/MAG welding — questions before a quotation
For a specific assembly, send the drawing, material and quantities.
Send a technical enquiry →Which materials do you weld with MIG/MAG?
Mainly carbon (structural) steel, for example S235 and S355. For stainless steel and aluminium we choose the process by thickness, joint type and appearance requirements — most often TIG.
Do you weld on site?
Our core work is done in the workshop in Požarevac, where preparation and inspection conditions are better. If site joints are required, state this in the enquiry so we can assess it.
Can you make a part without a drawing?
Yes, from a sample or a dimensioned sketch, provided the material and purpose are clear. For repeat items and structures we recommend a dimensioned drawing.
Who supplies the material?
Either the client or BogoHvac, as agreed. Material supply, mill certificates and lead times are stated in the written quotation.
Related services
The process follows the joint
One assembly often combines several processes and operations. The final scope is confirmed in the written quotation.
TIG welding (141)
Stainless steel, aluminium, copper and thinner walls; pipes and flanges where appearance and root control matter.
TIG welding →MMA / stick welding (111)
Covered electrodes for steel structures, repairs, thicker sections and joints with difficult access.
MMA welding →Metal structures
Brackets, bases, frames, walkways and auxiliary structures to your design.
Metal structures →Next step
Send the drawing of your steel item or assembly.
State the material, dimensions, quantity, inspection requirements and required lead time.